VerifiedGit
v1.0.0

change-order-analysis

by @datadrivenconstruction0 pulls
URLopenbooklet.com/s/change-order-analysis
Pinnedopenbooklet.com/s/[email protected]
APIGET /api/v1/skills/change-order-analysis

Analyze and predict construction change orders using ML. Classify change order types, predict costs and schedule impacts, identify patterns, and optimize approval workflows.

change-order-analysisviewing
4d-simulation2_DDC_Book/3.3-4D-BIM-CO2-Simulation/4d-simulation/SKILL.md

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

5000-projects-analysis1_DDC_Toolkit/Kaggle-Notebooks/5000-projects-analysis/SKILL.md

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

airflow-dag2_DDC_Book/4.2-ETL-Automation/airflow-dag/SKILL.md

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

as-built-documentation1_DDC_Toolkit/Document-Control/as-built-documentation/SKILL.md

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

as-built-tracker1_DDC_Toolkit/Closeout/as-built-tracker/SKILL.md

Track as-built documentation and record drawings. Monitor submission status, manage revisions, and ensure completeness for handover.

big-data-analysis2_DDC_Book/4.4-Vector-Search-BigData/big-data-analysis/SKILL.md

Analyze large-scale construction datasets. Process thousands of projects for patterns, benchmarks, and predictive insights.

bim-clash-detection1_DDC_Toolkit/BIM-Analysis/bim-clash-detection/SKILL.md

Detect and analyze geometric clashes in BIM models. Identify MEP, structural, and architectural conflicts before construction.

bim-classification-ai1_DDC_Toolkit/BIM-Analysis/bim-classification-ai/SKILL.md

Classify BIM elements using AI and standard classification systems. Map elements to UniFormat, MasterFormat, OmniClass, and CWICR codes.

bim-cost-estimation-cwicr1_DDC_Toolkit/Cost-Management/bim-cost-estimation-cwicr/SKILL.md

Automated cost estimation from BIM models using DDC CWICR database with 55,719 work items. AI classification + vector search for accurate pricing.

bim-to-schedule-4d1_DDC_Toolkit/Schedule-Integration/bim-to-schedule-4d/SKILL.md

Create 4D construction simulations by linking BIM models with project schedules.

bim-validation-report1_DDC_Toolkit/BIM-Analysis/bim-validation-report/SKILL.md

Generate comprehensive BIM model validation reports. Check data quality, completeness, and compliance with standards.

budget-variance-analyzer4_DDC_Curated/Financial-Management/budget-variance-analyzer/SKILL.md

Analyze budget vs actual cost variances. Identify overruns, forecast final costs, and generate variance reports.

cad-to-data2_DDC_Book/2.4-PDF-CAD-to-Data/cad-to-data/SKILL.md

Convert CAD/BIM files to structured data. Extract element data from Revit, IFC, DWG, DGN files.

carbon-calculator1_DDC_Toolkit/Sustainability/carbon-calculator/SKILL.md

Calculate embodied carbon in construction materials. Track CO2 emissions, compare alternatives, and generate sustainability reports.

cashflow-forecaster4_DDC_Curated/Financial-Management/cashflow-forecaster/SKILL.md

Forecast construction project cash flow. Project income and expenses, identify funding gaps, and optimize payment timing for improved financial management.

claims-documentation4_DDC_Curated/Contract-Legal/claims-documentation/SKILL.md

Document construction claims for disputes and recovery. Compile evidence, calculate damages, track notice requirements, and prepare claim packages.

clash-detection-analysis5_DDC_Innovative/clash-detection-analysis/SKILL.md

Detect and analyze geometric clashes between BIM elements. Identify hard clashes, soft clashes, and workflow conflicts using spatial analysis and rule-based detection.

clash-resolution-analyzer2_DDC_Book/4.3-BIM-Validation-Pipeline/clash-resolution-analyzer/SKILL.md

Analyze BIM clash detection results and suggest resolutions. Prioritize clashes, identify patterns, assign responsibility, and track resolution status.

co2-carbon-footprint1_DDC_Toolkit/Sustainability/co2-carbon-footprint/SKILL.md

Calculate CO2 emissions and carbon footprint from BIM model data. Analyze embodied carbon by material, element, and building system.

contract-clause-analyzer1_DDC_Toolkit/Document-Control/contract-clause-analyzer/SKILL.md

Analyze construction contract clauses. Identify risks, obligations, and key terms using NLP.

Auto-indexed from datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction

Are you the author? Claim this skill to take ownership and manage it.

Related Skills

@openbooklet

graceful-error-recovery

Use this skill when a tool call, command, or API request fails. Diagnose the root cause systematically before retrying or changing approach. Do not retry the same failing call without first understanding why it failed.

1.1K0
@openbooklet

audience-aware-communication

Use this skill when writing any explanation, documentation, or response that will be read by someone else. Match vocabulary, depth, and format to the audience's expertise level before writing.

1.1K0
@openbooklet

Refactoring Expert

Expert in systematic code refactoring, code smell detection, and structural optimization. Use PROACTIVELY when encountering duplicated code, long methods, complex conditionals, or any code quality issues. Detects code smells and applies proven refactoring techniques without changing external behavior.

600
@openbooklet

Research Expert

Specialized research expert for parallel information gathering. Use for focused research tasks with clear objectives and structured output requirements.

600
@openbooklet

clarify-ambiguous-requests

Use this skill when the user's request is ambiguous, under-specified, or could be interpreted in multiple ways. If proceeding with a wrong assumption would waste significant work, always ask exactly one focused clarifying question before doing anything.

1.1K0
@openbooklet

structured-step-by-step-reasoning

Use this skill for any problem that involves multiple steps, tradeoffs, or non-trivial logic. Think out loud before answering to improve accuracy and transparency. Apply whenever the answer is not immediately obvious.

1.1K0